Maintenance is a program to keep all the parts of the machine in perfect condition with minimum wear and tear.
Preventive Maintenance in Blow Room;
It means to attend and check the machines regularly and systematically and defects are discovered and remedied before they cause a need for, major repair and before the wear & tear of the machine starts affecting the quality and production,
|
Parts to be inspected | Rating & Action taken Remarks Repaired/replaced |
| check the condition of
|
|
1 | spikes on lattice &lattice tension
| If the part is defective, write "poor & needs Correction" in the rate & Remark column. |
2 | Striking edge of all the beaters
|
|
3 | Feed roller weighting & its setting with beater. | The parts that are replaced or repaired will be entered by maintenance incharge. |
4 | Position of damper & air current in the cage.
|
|
5 | Sharpness of blade/spike/pins of beater.
| Importance of maintenance in Blow Room. |
6 | Stripping rail setting in beater.
|
|
7 | Function of P.E. cell swing door & other feed control mechanisms.
| If a serious breakdown occur in Blow |
8 | Condition of pedal feed control mechanisms. |
|
9 | Calender Roller bearing & its weighting. | Room, a high proportion |
|
| of a Mills production will |
10 | Racks condition & Effectiveness | be stopped causing the |
| of brake.
| subsequent process to be |
11 | Timing and synchronisation of | short of material. |
| auto doffing mechanism.
| This can be avoided to |
12 | Lap length measuring motion.
| some extent by a thorough |
13 | Lap hardening Mechanism.
| inspection and systematic |
14 | Lubrication system
| Programme of maintenance. |
15 | Al1 bearings-condition.
| which can also helps to |
16 | Belt, gear, chain, Robe & | reduce the 1ap |
| all driving connection.
| irregularities and improve |
17 | Motor & its pulley condition.
| the cleaning efficiency. |
18 | Roller vibration/ Eccentricity
|
|
19 | Speed & settings.
|
|
20 | Pan whether chocked with dust, |
|
| or not.
|
|
21 | R.H.% & Temp condition.
|
|
22 | Ratio of fan to beater speed & |
|
| Air current.
|
|
23 | Robe & Bls tension.
|
|
24 | All nuts, Bolts, screws-tightening
|
|
25 | Check for any rough places on |
|
| various rollers or calenders
|
|
Routine Maintenance in Blow Room: It means to attend the machine and maintenance work is carried out as per the maintenance schedule so as to maintain the Machine in perfect condition with minimum wear & tear.
Nature of operation Frequency
|
1. Dismantling -Checking- thorough
cleaning & resetting of
i) Cage Unit, ii) Lap doffing unit Every month
iii) Lap measuring Motion |
| |
| iv) Lap hardening Mechanism. |
|
| v) Piano feed regulating Motion
|
|
|
|
|
2. | Cleaning of grid bar
| Every shift |
|
|
|
3. | Removal of droppings from beneath |
|
| the grid bar.
| Twice per Shift |
|
|
|
4. | Straightening of bent pins of | Whenever needs |
| kirschner beater and sharpening the |
|
| beater blade.
|
|
|
|
|
5. | Polishing of grid bar.
| 6 months |
|
|
|
6. | reversal of beater blade.
| 1 year |
|
|
|
7. | Re dressing of beater blade
| 2 year |
|
|
|
8. | Clean inside the cage
| each shift. |
|
|
|
9. | Applying Black-lead powder inside the |
|
| cage | periodically |
|
|
|
10 | . General cleaning
| .15 days |
|
|
|
11 | . Lubrication of all the gear wheel | Daily & greasing at |
| &. bearing.
| the time of frame cleaning. |
|
|
|
12 | correct the leakage places in the |
|
| entire pneumatic duct line. | Every week. |